PROJECTS
Deck Fabrication, Offshore hookup
Location: Trinidad, West Indies
The Juniper offshore gas platform topsides was fabricated at our facility in La Brea, Trinidad. The project marks a milestone for Trinidad and Tobago as it is the largest offshore structure ever fabricated in the country. Juniper is a Normally Unmanned Installation (NUI) measuring 145 feet to the top of the helideck and weighing approximately 5,200 short tons. It was installed 50 miles off the southeast coast of Trinidad at a water depth of 360 feet. Two million man hours without a lost time incident and more than 750 people working during peak construction.
AERIAL PIPELINE ABANDONMENT REACHES NEW HEIGHTS
Location: Wax Lake Outlet, Atchafalaya Bay, Louisiana
Morrison was contracted to develop a solution that met stringent regulatory and safety requirements. A major key to the safe and successful completion of this ground breaking project was the meticulous planning of the work and the proactive client/contractor partnership.
FABRICATION & OFFSHORE HOOKUP OF THE BG POINSETTIA
Location: La Brea, Trinidad and BGTT Poinsettia field
› Completed fabrication and installation without injury or environmental impact, before the target date and under budget.
› The BGTT Poinsettia is the largest platform fabricated to date in Trinidad and Tobago.
› Winner of the Overseas Project of the Year Award from the Association of Project Management.
PIPING FABRICATION & INSTALLATION
Location: Raceland, Louisiana
Pipeline and spool fabrication and installation for the Virdia Bagasse Processing Facility. The facility is designed to convert sugar cane bagasse, or sugarcane waste, into industrial sugars and biofuels.
PIPELINE INSTALLATION
Location: Atchafalaya Bay
› Preplanned job with client to determine constructability issues related to pipeline route
› Engineered solutions to provide safer, more cost efficient solutions
› Project team consisted of approximately 90 people including in-house dive teams
› Project duration was over 7 months, working 24/7 operations during winter months
Pipeline Abandonment
Location: West Bastian Bay, Environmentally Sensitive Area (Oyster Beds)
› Flush 8″ pipeline
› Cut and abandon three sections (approximately 2,777′) of 8″ pipe
› Remove 2 timber platforms
› Remove 8 signs
› Remove 4 bulkheads
36″ PIPELINE LEAK REPAIR
Location: West Cameron 245
› Perform the required 36″ pipeline leak repair in a planned and controlled manner with the safety of personnel and piping systems of the utmost importance.
› Perform the work in a timely manner to assist Enbridge/Stingray Pipeline Company with the repair program.
PIPELINE REMEDIATION
Location: Lafourche Parish near the Fourchon Beach shoreline off Louisiana coast
› Utilized the CM-11 Pipelay Barge and the CM-14 Construction Barge to deploy 152 articulated concrete mats on an exposed section of a 48” pipe. Approximately thirty personnel, including our in-house dive teams, were assigned to this project, working 24/7 operations.
› The project was completed incident-free with no environmental impact.
FT. ELLIOT METER STATION INTERCONNECT
Location: Wheeler, Texas
› Installation of Two (2) Hot Taps
› Risers and Above-Ground Piping/Valves
› Pre-Fabricated Flow Control Skid
› Pre-Fabricated ANR EGM/Gas Chromotograph Building
› Associated Electrical/Civil Work
SHALLOW WATER PLATFORM SALVAGE
Location: West Cameron 45
› The project was completed incident-free with no environmental impact.