Onshore


PRESSURE WELD REPLACEMENT PROGRAM

Katy to Cypress, Texas


Morrison was contracted by one of the largest energy infrastructure companies in North America for their pressure weld replacement program which included the removal and replacement of approximately 3.8 miles of 24” diameter interstate natural gas pipeline and all associated facilities.

This program was part of a proactive initiative by our client, the pipeline operator, to identify and replace worn or damaged welds on the pipeline to ensure continued safety and operational integrity.

  • 20,000 feet of pipeline
  • 24 segments were excavated and limiting weld was identified
  • Close proximity to residential developments
  • HDD and major river crossings
  • Interstate, highway, road and railroad crossings
  • Mainline valve and facility sites
  • Self-performed hydro-testing and torqueing

This project was executed at onset of COVID-19 and was successfully managed with zero COVID-19 impacts.