Inland + Coastal

cable vessel

FIBER OPTIC CABLE INSTALLATION

Guyana, South America


Morrison’s CM-9 pipelay and construction barge was utilized to perform the completion of a Pre-Lay Shore-End (PLSE) between shore and approximately 15 m water depth.

The CM-9 barge is a 180 foot ABS classed and flagged (Vanuatu) vessel with accommodations for 44 personnel.

  • Shallow water beach approach
  • Marsh Excavation