Morrison was contracted by a leading, Texas-based natural gas and oil production company for the expansion for a Horizontal Tank Battery facility in the Permian Basin.
Mechanical, electrical and instrumentation on the expansion for the facility included:
One Compressor, one process train, 3-Phase Separator, and a Heater Treater
Fabrication and installation of one stick built Inlet Manifold Expansion
Installation of the vessels
Installation of the compressor
Fabrication of all piping connections and pipe racks
The project was completed with zero safety incidents, on budget and within schedule.