Morrison’s Onshore Construction Division completed a compressor booster station at New Jersey Resources Leaf River Energy Center in Southeastern Mississippi. This project expanded the facility’s capacity and operational efficiency.
- Successfully installed 5000 hp centrifugal compressor system
- Developed 4.5 acres with 550+ cubic yards of concrete foundation
- Completed comprehensive mechanical, electrical, and control systems integration
- Executed major mainline tie-ins to existing infrastructure
- Installed complete compressor building and portable control room
The scope encompassed full valve system integration (manual, actuated, and control) plus installation of auxiliary components including blowdown silencer units, pump and sump tank assemblies, and complete oily water separation and management infrastructure.