Onshore

48" pipeline installation and HDD

48-In PIPELINE INSTALLATION & HDD

St. James, Louisiana


Phase VII Tank 5500 Expansion

  • Portion of piping was horizontally directionally drilled under the road, then turned above ground to terminate at the Tank
  • Above-ground install consisted of concrete driven piles & structural members