As part of the Iguana Field Development project, Morrison laid and buried 45-km of 14-inch pipe from the offshore structure to the beach approach pipeline tie-in onshore at Port Lisas, Trinidad.
- Beach approach was in environmentally sensitive mangroves area
- Engineered and developed installation plan to overcome environmental challenges
- Minimized dredging activities by pushing pipe and floating pipe to beach
- Reduced expected footprint by 50% during pipe-lay installation activities