Inland + Coastal

Shore crossing project

SHORE CROSSING | BEACH APPROACH

Pt. Lisas, Trinidad


As part of the Iguana Field Development project, Morrison laid and buried 45-km of 14-inch pipe from the offshore structure to the beach approach pipeline tie-in onshore at Port Lisas, Trinidad.

  • Beach approach was in environmentally sensitive mangroves area
  • Engineered and developed installation plan to overcome environmental challenges
  • Minimized dredging activities by pushing pipe and floating pipe to beach
  • Reduced expected footprint by 50% during pipe-lay installation activities