FACILITY DECOMMISSIONING AND DEMOLITION

Pierre Part, Louisiana


Three Phase Decommissioning Project of Inland Facility:

  • Isolation and removal of the three production barges that client had on site, including the removal of the assets from the barge.
  • Complete decommissioning and demolition of the existing production platform and associated pipe racks and piping. Equipment was transported to Harvey Fabrication lay down yard. Removal included removal of the concrete decks, the concrete sills, and all 24” pipe legs that made up the platform. Removed hundreds of timber pilings and 100-ft of piping that made up the pipe rack to transfer product to the production barges from the platform. Removed all piping and platforms to and from the well head.
  • Removal of the underground 8” pipeline and all pile clusters used to tie up barges and boats.

Project was completed safely, on time and under budget.