Onshore

Meter station interconnect

METER STATION INTERCONNECT

Wheeler, Texas


  • Installation of two hot taps (10″ on 10″ and 10″ on 16″).
  • Risers and above ground piping/valves
  • Pre-fabricated flow control skid
  • Pre-fabricated EGM/Gas Chromotograph Building
  • Associated Electrical/Civil work.

With 4,858 total manhours, the project was completed incident-free without environmental impact.

I was really impressed with the safety culture and the level of teamwork shown by the crew onsite. Every person on the crew showed a real commitment to safety, not only by following the policies themselves, but by looking out for one another throughout the duration of the project.

Client Project Manager