
Completed first pipeline installation in the Gulf of America for the 2025 season.
Installation executed by the crew aboard the DLB Super Chief, Morrison’s 265′ x 72′ pipelay barge that is ABS-classed and proudly US flagged.
The 8” oil pipeline was installed for Crescent Midstream off the coast of Louisiana in 425 ft of water.