Diving

Offshore + Deepwater

DLB Super Chief Lift Boat | Morrison Energy

8″ PIPELINE INSTALLATION in 425WD

Gulf of America


Morrison successfully completed the first pipeline installation in the Gulf of America for the 2025 season.

Installation was executed by the crew aboard the DLB Super Chief, Morrison’s 265′ x 72′ pipelay barge that is ABS-classed and proudly US flagged.

The 8” oil pipeline was installed for Crescent Midstream off the coast of Louisiana in 425 ft of water.

Morrison is proud to play a part in strengthening America’s energy security one pipeline at a time.