INLAND CONSTRUCTION


Unparalleled Expertise in Inland Marine Construction

Contact Us

YOUR PIPELINE NETWORK EXPERTS

Whether it’s pipeline installation construction, maintenance and integrity, or decommissioning, our team can support every stage of your pipeline system.

Pipeline Installation

Abandonment/Decommissioning

Emergency Leak Repairs

Restoration/Revetment

Directional Drilling/Water Crossing

Hydrostatic Testing

Execution/Burial

Emergency Leak Repairs

Expansions/Major Upgrades

Integrity Repairs


INLAND MARINE SERVICES

Morrison specializes in navigating the complexities of shallow water construction with precision and expertise. As an inland construction leader, we deliver creative and pragmatic solutions that exceeding industry standards and client expectations

Plan Your Project


THE MORRISON ADVANTAGE

When you choose Morrison, you get:

  • Superintendent Experience
  • Reliable Fleet of Barges
  • Project Management Expertise
  • Trust & Transparency
  • High level of industry standards in Health,
  • Safety, Quality & Environmental

OUR INLAND INNOVATORS

Morrison brings over 40 years of experience providing comprehensive pipeline, construction, repair and maintenance along the Gulf Coast, with a specialized focus on inland construction and shallow water expertise. Our team of experts safely plans, builds and delivers quality oil & gas infrastructure services—on time and on budget—while navigating the complexities of inland environments with creative and pragmatic solutions that exceed industry standards.

Start Your Project

Where Stability Meets Capability

Our fleet of barges combines proven marine engineering with specialized equipment to tackle any inland waterway project.
Each barge delivers the stability and capability your project demands.

OUR FULL LIST OF FLEETS

CM-12


CM-16


CM-6


CM-14

FEATURED PROJECTS

With some of the most versatile and efficient barges and equipment, we are more than qualified to handle your next inland construction project.

50 X 20 COFFER DAM INSTALLATION

Installation of a cofferdam at the entry side tie in point on a recently installed 3500’ 16” HDD.

Learn More

INSTALLATION OF 16” PIPELINE

Buras, LA 16” New Pipelay Operations by way of Morrison CM 14 Barge Asset.

Learn More

PIPELINE RECONNECTION AND HYRDOSTATIC TESTING

Pipeline reconnection to perform a hydrotest on a 6” pipeline from Hackberry to Orange, TX and 4” under the Sabine River.

Learn More