
Morrison successfully completed the first pipeline installation in the Gulf of America for the 2025 season.
Installation was executed by the crew aboard the DLB Super Chief, Morrison’s 265′ x 72′ pipelay barge that is ABS-classed and proudly US flagged.
The 8” oil pipeline was installed for Crescent Midstream off the coast of Louisiana in 425 ft of water.
Morrison is proud to play a part in strengthening America’s energy security one pipeline at a time.